Thursday, April 29, 2010

Top Floor

Seems like the 2nd floor--which will be for the tenant--is getting sheet-rocked first.
This is looking towards the living room (bathroom on the left, large closet on the right)
It's hard to tell, even with Todd in there for scale, but the ceilings in the front room are ridiculously high. We had to fight the contractor to leave them that way and let them slope--but it was so worth it.

and towards the back of the house where their kitchen will be:
It's hard for me to look at all this sheet-rock, thinking about the old plaster walls that used to be there, but I just have to think about the details that will go in later....lots and lots of details. Please.

No comments:

Post a Comment