Saturday, June 5, 2010
The long wait.
After failing the plumbing inspection (which should SO not have happened, if only the contractors had done what they were supposed to) the DOB was supposed to return in 2 weeks to re-inspect. Now it turns out the appointment is for the 21st of June. Aside from a little fire-place work, this week was a complete and utter waste --the contractors didn't even show up.